Client: Saffron Housing Trust Limited

Structural Engineer: Hale Alan Jones

The concrete access deck at first floor level had suffered from ‘concrete cancer’ and had become unsafe.  The structure had to be demolished and a new deck created from precast concrete units on new brackets and posts.  Each unit, 6 meters long and weighing nearly 6 tonnes had to be threaded carefully into the existing structure by crane.  The walkway was finished with asphalt waterproofing and new steel railings.

Contract Value: £80,000.00

Contract Period: 10 Weeks

Contract Type: Traditional

Completion: April 2012